Marking and Feedback
Structural Integrity:
The box must be stable and able to stand on its own without collapsing.
The box must be stable and able to stand on its own without collapsing.
Integrated Lid:
The box must have an integrated lid that opens and closes smoothly.
The box must have an integrated lid that opens and closes smoothly.
Size Consistency:
The dimensions of the box must adhere to the specifications provided in the user stories.
The dimensions of the box must adhere to the specifications provided in the user stories.
Design and Decoration:
The box must be decorated according to the design requirements specified in the user stories.
The box must be decorated according to the design requirements specified in the user stories.
Quality Assurance:
The Product Owner must inspect the box to ensure it meets all the acceptance criteria outlined in the user stories.
The Product Owner must inspect the box to ensure it meets all the acceptance criteria outlined in the user stories.
Timebox Compliance:
The box must be completed within the allocated sprint time.
The box must be completed within the allocated sprint time.
Team Agreement:
All team members must agree that the box meets these criteria.
All team members must agree that the box meets these criteria.
Presentation Ready:
The box is ready to be presented in the final review.
Feedback Incorporated:
Any feedback from the previous sprint review must be incorporated.
Should a team meet all these criteria, then they can confidently say that the ProductBox is "Done". This ensures a high-quality output and aligns the team on what needs to be achieved for successful completion.
No Comments